Before a risk analysis is to be performed all information regarding the case
must be collected.
Example :
Escape stair towers on some oil platforms in the North Sea are an example
where the use of a risk analysis led to the decision of using structural aluminium
alloy.
The input for the risk analysis was the material properties of the aluminium
alloys used. The fire scenario including the thermal load and the production of
the toxic gasses and the smoke, the lay out of all escape routes and the
environmental conditions. The conclusion from the risk analysis was that if the
aluminium alloy escape stair tower was engulfed either in smoke/toxic gasses or in
flames, it was useless and perilous as an escape way long before the structural
aluminium was going to collapse. The lay out of the escape routes always
secured at least one safe escape way.